يعرض الحافلات، الترامات وعربات الترام عبر GPS
يعرض الحافلات، الترامات وعربات الترام عبر GPS
تُظهر الخدمة موقع الحافلات، والحافلات الكهربائية، والترام عبر نظام تحديد المواقع العالمي GPS/GLONASS. يمكنك معرفة أين يتحرك النقل العام واتخاذ قرار متى تذهب إلى المحطة.

| البداية - النهاية / header / cause / effect | description |
|---|---|
| - Starting Monday, March 16, Sound Transit will close Kent Station’s northwest Sounder surface parking lot. NoneNone | The only available spots for this lot will be three ADA parking spots. This closure will last the duration of this project phase. We expect this phase to be completed in December 2026. We encourage drivers to use the existing Kent garage at W Smith St and 1st Ave N.
<br><br>For more information on the project, visit the Kent Station Parking and Access Improvement Project page.
<br> قطار S Line |
| - Starting Oct. 14, the Sumner Station surface parking lot on Narrow Street will be closed, except for four ADA-accessible parking spaces. New parking spaces on Harrison Street will open on Oct. 12. NoneNone | The surface lot closure will remain in effect until construction of the new parking garage on Harrison Street is complete.
<br><br>New parking spaces will become available adjacent to the new garage beginning Monday, Oct. 12. Alternative parking is also available at the Puyallup Station parking garage and surface lot.
<br><br>For more information about other transit parking options, click the link below.
<br><br>Please note that schedules may change. Subscribe to service alerts to receive the latest updates.
<br><br>Affected lines:
<br>S Line قطار S Line |
| - Due to equipment shortages, Sounder S Line Train #1508 from Lakewood Station to King Street Station will operate with 5 cars. NoneNone | S Line train #1508 (6:06 a.m., Lakewood Station to King Street Station)
<br><br>We understand this may result in more crowded conditions than usual. We appreciate your patience and understanding. If your schedule allows, please consider alternative train options.
<br><br> Thank you for your continued support and flexibility. قطار S Line |
| - From Tuesday, Sept. 8, through Saturday, Oct. 31, from 6 a.m. to 5 p.m. daily, sidewalk revision work will take place at 77th Ave SE near the west entrance to Mercer Island Station. NoneNone | This work will take place outside the west entrance of 77th Ave SE. The sidewalk will be closed to northbound traffic during working hours, including the drop-off/pick-up location.
<br><br>The sidewalk to the north of this entrance will be closed for the duration of the project, so passengers can only access this entrance from the south. ترام 2 Line |
| - Pioneer Square Station - Elevator 702 unavailable until further notice due to scheduled maintenance. NoneNone | To ride the 1 Line Federal Way:
<br><br>1. Cross the North Mezzanine
<br>2. Take the elevator down to the Lynnwood platform.
<br>3. Go to the opposite end of the Lynnwood platform toward Exit C.
<br>4. Take the elevator up to the South Mezzanine.
<br>5. Cross the South Mezzanine.
<br>6. Take the elevator down to the Federal Way platform.
<br><br>To exit the station:
<br><br>1. Go to the opposite end of the platform.
<br>2. Take the elevator up to the South Mezzanine.
<br>3. Take the elevator at Exit C (3rd Ave & Yesler Way) up to the street. ترام 2 Lineترام 1 Line |
| - From Aug. 10, 2026, through Feb. 15, 2027, parking capacity will be reduced at Kent Sounder Station Garage due to construction. NoneNone | Passengers can continue to park in the garage and access Kent Sounder Station throughout construction.
<br><br>This project will repair and improve the garage’s concrete structure to help maintain a safe and reliable facility for riders.
<br><br>Parking Level 5 is now open, and work on Level 4 is scheduled to begin October 13. Please remain aware of construction activities and follow all posted signage when entering or moving through the garage.
<br><br>We understand that construction may cause some inconvenience to your daily commute, and we appreciate your patience and understanding as this important work moves forward. We’ll continue to share updates as more information becomes available.
<br><br>Subscribe to Rider Alerts to receive the latest information and updates about construction impacts. قطار S Line |
| - Federal Way Downtown Station - Elevator 1 unavailable until further notice due to scheduled maintenance. NoneNone | To ride the 1 Line:
<br><br>1. Go to the opposite end of the station.
<br>2. Take the elevator up to the platform.
<br><br>To exit the station:
<br><br>1. Go to the opposite end of the platform.
<br>2. Take the elevator down to the street. ترام 1 Line |